Case Studies

TPA panels pave the way for cost savings

TPA panels pave the way for cost savings - 12/03/19

Portable roadways supplied by temporary access solutions provider TPA are protecting land from damage and helping deliver a major 30-mile power line refurbishment in the most cost-effective way.

Geotechnical Contractor (HS2 works)

Geotechnical Contractor (HS2 works) - 01/04/18

A bespoke access solution was provided for a Geotechnical Contractor in a sensitive location to enable ground investigation tests and directional borehole drilling. This project forms part of the ground investigation framework for HS2 with site investigations (SI) being undertaken to demanding standards.